Dace Price Booklet logo
Dace Price Booklet logo
  1. Chapters
  2. Pipe Bridge

F2003. Pipe bridge

Steel, truss pointer pipe bridges.

Span width max. 15 m.

Steel construction (not fire proofed) painted.

Including:

  • Pile foundation;

  • Provisions for cable trays.

Excluding:

  • Treating and dumping cost of contaminated ground;

  • Exploratory trench excavation;

  • Provisions for underground infrastructure;

  • Walkway on pipe bridge;

  • Provisions for extension in the future;

  • Terrain finishing.

Sign in to access this content

Please sign in to your account to view this information.