Dace Price Booklet logo
Dace Price Booklet logo
  1. Overview

Chapters

AProcess equipment

Process equipment
  • A1Static process equipment
  • A2Mechanical process equipment
  • A3Transportation equipment
  • A4Utilities
  • A5HVAC equipment

BPiping material

Piping material
  • B1Pipe and fittings
  • B2Ducting en chimneys
  • B3Valves and appendages
  • B4Complete delivered and installed piping systems

CPainting and insulation

Painting and insulation
  • C1Painting
  • C2Insulation

DElectrical

Electrical
  • D1Energy supply
  • D2Energy conversion

EInstrumentation and process controls

Instrumentation and process controls
  • E0Explanation of instrumentation and process control
  • E1Systems, in general
  • E2Instrumentation for quality measurement
  • E3Instrumentation for volume, flow and weight
  • E4Instrumentation for level
  • E5Instrumentation for pressure
  • E6

FCivil and buildings

Civil and buildings
  • F0Explanation
  • F1Building complete
  • F2Civil work
  • F3Indirects
  • F4Building and civil details
  • F5Building HVAC and Electrical installation
  • F6Terrain

GEngineering costs

Engineering costs
  • G0Explanation Estimating engineering cost
  • G1Estimating engineering costs

HGeneral data

General data
  • H1Base material
  • H2Hourly rate
  • H3Energy
  • H4SI units
  • H5Index figures
Instrumentation for temperature
  • E7Instrumentation for valves
  • E8Installation materials